synoptic_project

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
synoptic_project [2019/04/09 15:28] bobsynoptic_project [2020/09/18 13:20] (current) – external edit 127.0.0.1
Line 9: Line 9:
 When the project requires you to access Practice-Labs or any other virtual platform, the BCS will issue the required codes to the college at least 5 days prior to the project start When the project requires you to access Practice-Labs or any other virtual platform, the BCS will issue the required codes to the college at least 5 days prior to the project start
  
-These codes or any other relevant information will be issued to the apprentice 5 days before the project start. Apprentices can use these codes and rehearse use of the systems in college or where ver they have a fast internet connection.+Apprentices can use these codes and rehearse use of the systems in college or where ever they have a fast internet connection.
  
 The synoptic project itself will be run at the college in a controlled environment: The synoptic project itself will be run at the college in a controlled environment:
Line 17: Line 17:
  
 You have up to 5 days to complete the project You have up to 5 days to complete the project
 +
 +You will be given all the relevant codes and information at the start of the project
 +
 +The hours spent on the project must be recorded
  
 At the completion of the project the college and the apprentice have to sign a Synoptic Project Declaration At the completion of the project the college and the apprentice have to sign a Synoptic Project Declaration
Line 22: Line 26:
   * The time taken to complete the project in hours    * The time taken to complete the project in hours 
   * That all the project outputs have been destroyed, once they are sent to the BCS   * That all the project outputs have been destroyed, once they are sent to the BCS
 +
 +The required project outputs and the signed declaration form are emailed to the BCS
 +
 +The BCS will issue an automatic ticket number to acknowledge receipt 
 +
 +[[Interview|NEXT]]
 +
 +[[Gateway|PREVIOUS]]
 +
 +[[Digital Apprentices|BACK]]
  • synoptic_project.1554823707.txt.gz
  • Last modified: 2020/09/18 13:18
  • (external edit)