steps_1-3

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
steps_1-3 [2019/09/24 15:22] – [Step 3] bobsteps_1-3 [2020/09/18 13:20] (current) – external edit 127.0.0.1
Line 37: Line 37:
  
 The training provider confirms that: The training provider confirms that:
-  
    *all Knowledge and Understanding is assessed on programme through Knowledge Modules and Vendor or Professional Qualifications has been completed and achieved a pass.    *all Knowledge and Understanding is assessed on programme through Knowledge Modules and Vendor or Professional Qualifications has been completed and achieved a pass.
    *that Functional Skills in Maths and English have been completed and achieved a C grade or above (or equivalent).     *that Functional Skills in Maths and English have been completed and achieved a C grade or above (or equivalent). 
Line 48: Line 47:
 The employer confirms that: The employer confirms that:
    *employer reference is in support of the evidence submitted.    *employer reference is in support of the evidence submitted.
- 
    *the apprentice is in full time employment at their declared place of work, covering the duration of the apprenticeship including the period covering the End Point Assessment.    *the apprentice is in full time employment at their declared place of work, covering the duration of the apprenticeship including the period covering the End Point Assessment.
  
- +Once the form is completed it is uploaded to ACE360 and emailed to the BCS team. The assessor then copies all the required documents to ACE360 and confirmed the candidate is ready of EPA. This must be done at least 10 working days before the start of the synoptic project. 
-Once the form is completed it is uploaded to ACE360 and emailed to the BCS team. and your assessor. The assessor then copies it into your Gateway Form folder. This must be done at least 10 working days before the start of the synoptic project. +
  
  
  • steps_1-3.1569338534.txt.gz
  • Last modified: 2020/09/18 13:18
  • (external edit)