Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| project_and_dissertation [2020/05/12 16:53] – [Module UFCFPU-30-3] bob | project_and_dissertation [2022/07/29 14:19] (current) – [Module UFCFPU-30-3 Level 6 30 credits] martin | ||
|---|---|---|---|
| Line 3: | Line 3: | ||
| ==== Module UFCFPU-30-3 Level 6 30 credits ==== | ==== Module UFCFPU-30-3 Level 6 30 credits ==== | ||
| - | ===== All information on this page is subject to validation and may change ===== | + | === Module team leader: UWE staff - Jonathan White === |
| - | === Module team leader: UWE staff === | + | {{ : |
| - | + | ||
| - | {{ : | + | |
| ==== Overview ==== | ==== Overview ==== | ||
| Line 33: | Line 31: | ||
| === Component A: Report, presentation and demonstration === | === Component A: Report, presentation and demonstration === | ||
| - | There are three elements to the assessment of the project. The major piece of assessed work is the project report. This will be between | + | Issued: Start of academic year 3 |
| - | + | ||
| - | | + | Due: Near the end of academic year 3 |
| - | *Requirements analysis (which may include defining | + | |
| - | *Identification and application of solution developmental, scientific or design methodology | + | There are three elements to the assessment of the project,structured both to support the student through the project and also to allow them both to demonstrate their report writing skills and to showcase their technical ability. |
| - | *Choice and application of technology | + | |
| - | *Evidence of self-management | + | The major piece of assessed work is the project report. This will be between |
| - | *Clarity of exposition within | + | |
| - | *Demonstration of: | + | In addition, at approximately the middle |
| - | | + | |
| - | | + | |
| - | *a flexible attitude | + | |
| - | *a thorough approach to work in the cyber security role | + | |
| - | In addition, at approximately the middle of the project period, apprentices are required to attend a project-in-progress day. The project-in-progress day is organised as a poster event and apprentices are expected to prepare a poster that describes their project idea and progress to date. The day is attended by academics from across the department and the employer and is an opportunity for apprentices, | ||
| ==== Submission details ==== | ==== Submission details ==== | ||
| - | To be added | + | All assignments will be submitted and feedback given on the UWE Blackboard system |
| - | ==== Reading | + | ==== Reading |
| - | To be added | + | [[https:// |
| ==== Communication ==== | ==== Communication ==== | ||
| - | All questions about this module, after the course commences, | + | All questions about this module should be initially directed to the module leader. |
| Please contact via email, which is monitored continuously | Please contact via email, which is monitored continuously | ||
| - | ==== Advice and support ==== | ||
| - | To be added | ||